Steps/Process:
1.) Getting Started:
- Determine if your location has enough wind.
- Most of the turbines can perform in a class 2 wind speed – starting at 8-9mph
- http://www.illinoiswind.org/windData/maps.asp
- AB will verify this wind speed information through an industry trusted site.
Determine you current usage - Your utility bill will be helpful for the following:
- Find out current utility provider. What is their policy on net metering and interconnection application and fees?
- How many kW do I consume in a Year?
- Check zoning ordinances in your area. Are you within city, township or county limits
2.) The Next Step:
- Site survey / Planning
- Copy down all the gathered information from above, select tower site, fill out plot plan, identify supply power pole, locate the utility meter -(Installation quote will be determined by site survey and distances from tower to meter)
- Apply for all necessary permits
- Submit application for net metering and interconnection to the appropriate utility provider
3.) Once Approved:
- Installation – usually takes one week start to finish. All Installations are done by Midwest Underground Technology Inc.
- Maintenance – turbine requires once a year preventive maintenance to ensure safety and longevity of unit.
Unit comes with 5 year warranty
Life expectancy of Endurance Wind Turbine 30 years
Arends Bros. & AB Wind Power not only provide wind solutions, but also benefit from the energy source. Check out the site below to view how we have helped the environment and how much power we have made at our Ashmore, IL location. http://northernpower.kiosk-view.com/ashmore